Completed Projects

01

N.V. Sklifosovsky Research Institute of Emergency Medicine. Pathology building with experimental laboratory.

In a six-storey building with a total area of more than 9,000 sq. m. a pathology department, a forensic medical examination department, a scientific and educational unit and an experimental laboratory with an animal clinic are located.
A total of 1,379 pieces of equipment were delivered.

02

Skolkovo International Medical Cluster. (The first stage of construction.) Diagnostic building.

The total area is 103,000 sq. m.
A total of 3,332 pieces of equipment and furniture were delivered.

03

Infectious Diseases Hospital in Troitsky and Novomoskovsky administrative districts of Moscow

The new infectious diseases hospital in Voronovsky was built and equipped in one month! A huge object with an area of 80,000 sq. m. has been created. This is a full-fledged infectious diseases hospital with 800 beds (with the possibility of expanding to 900 beds and transforming each bed into an intensive care unit within 24 hours).
In total, more than 29,000 units of medical equipment, furniture, office equipment and inventory were delivered.

04

Hospital with maternity hospital
(Kommunarka, Sosenskoye settlement). (The first stage of construction.)

The medical cluster in Kommunarka was equipped with the most modern equipment. The area of the buildings is 87,000 sq. m.
A total of 4,949 pieces of equipment were delivered.

05

Hospital with maternity hospital
(Kommunarka, Sosenskoye settlement). (The second stage of construction.) Outpatient building.

Outpatient building with an area of 8,090 sq. m. is equipped and put into operation — 3,119 units of medical equipment and furniture were delivered.

06

Hospital with maternity hospital
(Kommunarka, Sosenskoye settlement). (The second stage of construction.) Maternity building.

Maternity hospital with an area of 22,309 sq. m. is equipped and put into operation — 8,115 pieces of equipment and furniture were delivered.

07

Hospital with maternity hospital
(Kommunarka, Sosenskoye settlement). (The second stage of construction.) Primary health care building.

Primary health care building with an area of 2,142 sq. m. is equipped and put into operation — 1,246 pieces of equipment and furniture were delivered.

08

Hospital with maternity hospital
(Kommunarka, Sosenskoye settlement). (The second stage of construction.) Infectious diseases building.

The infectious diseases building with an area of 11,872 sq. m. is equipped and put into operation — 5,255 units of medical equipment and furniture were delivered.

09

Hospital with maternity hospital
(Kommunarka, Sosenskoye settlement). (The second stage of construction.) Children’s building.

The total area is more than 24 thousand sq. m.
Number of floors 7.
12,620 pieces of equipment and furniture were delivered.

10

Children's and adult polyclinic for 750 visits per shift with a women's consultation

The total area is 15,000 sq. m.
Number of floors 7.
13,030 pieces of equipment were delivered.

11

Emergency stationary complex with a helipad on the territory of the State budgetary healthcare institution "S.P. Botkin State Clinical Hospital of the Moscow Department of Health"

A short-term stationary complex with a helicopter pad on the territory of the State budgetary healthcare institution "S.P. Botkin State Clinical Hospital of the Moscow Department of Health", at the address: 2nd Botkin Ave., 5, Moscow.
The total area of 16,400 sq. m.
Number of floors 7.
8,995 pieces of equipment and furniture were delivered.

TOP